ChancellorAlcantara361
At least two soil excavations must be performed on the location, at opposite ends of the proposed disposal space. Locations of soil boring or dug pits should be shown on the site drawing. For subsurface disposal, soil evaluations should be performed to a depth of at least two feet below the proposed disposal field excavation depth. For surface disposal, the surface horizon should be evaluated. Describe each soil horizon and identify any restrictive features on this form. Indicate depths where features seem.
How to browse a Soil Boring Report: The soil investigation report is a crucial piece of data. It describes the soil kind, soil group, depth to bedrock, depth to seasonal wetness, moreover because the depth, color, and texture of the various soil layers. The soil investigator will perform 5 or six soil boring within the proposed septic drainfield area. The soil cluster, depth to bedrock, and depth to seasonal wetness are the most vital factors in determining if a conventional drainfield is installed. Modifications to the standard drainfield embody a field with shallow trenches or raised trenches. Where a traditional drainfield cannot be installed, a sandfilter is required. The soil boring report is valid as long because the land described in the report has not been modified by cutting away the soil or by adding fill soil. The report solely describes the highest 5 feet of soil.